Deliverables, Milestones

Status of all VENTURI deliverables and milestones, including the final version of all documents.

 

Submitted

WP1

  • D1.1 Risk Identification and Management & Quality plan – M5 (FBK, R, PU): Feb 2012: pdf (1.9M)
  • D1.3.1 Periodic activity report Year 1 – M12 (FBK, R, CO): Sep 2012: pdf (1.1M)
  • D1.3.2 Periodic activity report Year 2 – M24 (FBK, R, CO): Sep 2013: pdf (1.6M)
  • D1.3.3 Periodic activity report Year 3 – M36 (FBK, R, CO): Sep 2014: pdf (1.5M)
  • D1.6 Public final activity report – M36 (FBK, R, PU): Sep 2014: pdf (1.6M)
  • D1.7 Final PUDiK (Plan for Using and Disseminating Knowledge) – M36 (FBK, R, PU): Sep 2014: pdf (2.5M)
  • VENTURI M12 Periodic Report: pdf (1.9M)
  • VENTURI M24 Periodic Report: pdf (2.2M)
  • VENTURI M36 Periodic Report: pdf (2.1M)

WP2

  • D2.1.1 Use cases, application definition and system requirements for STE U8500-based platform – M3 (ST-I,R,PU): Dec 2011: pdf (1.0M)
  • D2.1.2 Use cases, application definition and system requirements for the second year demonstrator on the STE platform – M19 (ST-I,R,PU): Apr 2013: pdf (830K)
  • D2.1.3 Use cases, application definition and system requirements for the third year demonstrator – M31 (FBK,R,PU): Apr 2014: pdf (1.8M)
  • D2.2.1 Early Detailed Design Specifications for STE U8500-based platform – M6 (STE, R, PP): Mar 2012: pdf (2.3M), docx (5.9M)
  • D2.2.2 Refined Detailed Design Specifications for STE L9540-based Platform – M15 (STE, R, PP): Dec 2012: pdf (1.1M)
  • D2.3.1 First implementation of junaio-based AR framework for STE U8500-based platform – M8 (metaio, P, PU): May 2012: pdf (0.6M)
  • D2.3.2 Second implementation of junaio-based AR framework for STE U8500-based platform – M18 (metaio, P, PU): Mar 2013: pdf (1.1M)
  • D2.3.3 Optimization of prototype based on evaluation – M30 (metaio, P, PU): Mar 2014: pdf (1.2M)
  • D2.4.1 STE U8500-based Platform baseline delivery, integrating existing AR framework – M3 (ST-I, P, PP): Dec 2011: pdf (1.2M)
  • D2.4.2 First STE U8500-based Platform baseline delivery, implementing D2.2.1 specifications – M9 (ST-I, P, PP): Jun 2012: pdf (1.1M)
  • D2.4.3 Second STE U8500-based Platform baseline delivery, implementing D2.2.2 specifications – M20 (ST-I, P, PP): May 2013: pdf (1.2M)
  • D2.6.1 First server side API and architecture – M10 (metaio, P, PU): Jul 2012: pdf (659K)
  • D2.6.2 Second server-side API and architecture – M22 (metaio, P, PU): Jul 2013: pdf (829K)
  • MS1 First delivery of STE U8500 and junaio based platform baseline – WP2, M6 (STE): Mar 2012: pdf (215K)
  • MS2 First server-side API and architecture – WP2, M10 (STE): Jul 2012: pdf (213K)
  • MS3 Second delivery of STE U8500 based platform baseline – WP2, M20 (STE): May 2013: pdf (250K)
  • MS5 Second server-side API and architecture – WP2, M22 (STE): Jul 2013: pdf (242K)
  • MS12 Second prototype implementation of AR framework – WP2, M9 (STE): Mar 2013: pdf (58K)

WP3

  • D3.1 Report on user expectations and cross-modal interaction – M16 (INRIA, R, PU): Jan 2013: pdf (4.1M)
  • D3.2 Interface design prototypes and/or mock ups – M16 (INRIA, R, PU): Jan 2013: pdf (3.8M)
  • D3.3 Final report on interface and interaction design – M34 (INRIA, R, PU): Jul 2014: pdf (3.9M)
  • MS7 User interface feedback from platform V1, recommendations for V2 – WP3, M18 (INRIA): Mar 2013: pdf (512K)
  • MS8 User interface feedback from platform V2 – WP3, M28 (INRIA): Jan 2014: pdf (590K)

WP4

  • D4.1 Synchronized dataset containing a dump of all on-board sensors of a real device, while being used in a real environment – M6 (STE, O, CO): Mar 2012: pdf (0.6M)
  • D4.2 Report on expected platform requirements of WP4 algorithms – M9 (FBK, R, CO): Jun 2012: pdf (0.8M)
  • D4.3 WP4 outcome definitions and API Specification for inter-task / inter-WP communications – M15 (ST-I, R, CO): Dec 2012: pdf (3.3M)
  • D4.4 Multi-modal estimation of geo-location and orientation – M18 (FBK, R, PU): Mar 2013: pdf (1.6M)
  • D4.5 Report and in the lab prototype of visual analysis and reconstruction of the scene – M24 (Fraunhofer, R, PU): Sep 2013: pdf (3.7M)
  • D4.6 Final prototype integrating all WP4 outcomes – M30 (FBK, P, CO): Mar 2014: pdf (3.7M)
  • MS9 First version of chain for geo-localization / orientation estimation – WP4, M12 (FBK): Sep 2012: pdf (201K)
  • MS10 Final version of chain for geo-localization / orientation estimation – WP4, M18 (FBK): Mar 2013: pdf (234K)
  • MS11 PC version of visual analysis and reconstruction of the scene, ready for integration – WP4, M24 (FBK): Sep 2013: pdf (203K)

WP5

  • D5.1 First Algorithms for and Report on 3D Visual and Audio Content Creation – M18 (Fraunhofer, R, PU): Mar 2013: pdf (4.8M)
  • D5.2 First Algorithms for and Report on 3D Social Data Mining – M18 (FBK, R, PU): Mar 2013: pdf (1.3M)
  • D5.3 API for Adaptive Content Delivery – M18 (FBK, R, PU): Mar 2013: pdf (1.1M)
  • D5.4 Prototype and Extended report on 3D visual content creation and fusion – M33 (Fraunhofer, R+P, PU): Jun 2014: pdf (3.5M)
  • D5.5 Prototype and extended report on 3D social data mining – M30 (FBK, R+P, PU): Mar 2014: pdf (1.5M)
  • D5.6 Extended report and prototype API for appropriate content delivery – M36 (FBK, R, PU): Sep 2014: pdf (1.3M)
  • D5.7 Report on web of data AR social semantic data mining – M22 (FBK, R, PU): Jul 2013: pdf (1.0M)
  • MS12 Preliminary Requirements for Adaptive Content Harvesting, Creation and Delivery for WP2 – WP5, M9 (Fraunhofer): Jun 2012: pdf (201K)
  • MS13 Final Requirements for Adaptive Content Creation and Delivery for WP2 – WP5, M18 (Fraunhofer): Mar 2013: pdf (202K)

WP6

  • D6.1 Report on the performance of platform profiling tools and techniques – M8 (ST-I, R, CO): May 2012: pdf (1.9M)
  • D6.2 Android/Linux QoS frameworks state of the art description and leveraging opportunities on AR use cases
    – M20 (ST-I, R, CO): May 2013: pdf (1.0M)
  • D6.3 Use case(s) implemented on VENTURI integrated platform V1 – M12 (ST-I, P, CO): Sep 2012: pdf (1.5M)
  • D6.4 Report on use-case benchmarking and QoE – M16 (SE, R, CO): Jan 2013: pdf (1.4M)
  • D6.5 Use case(s) implemented on VENTURI integrated platform V2 – M24 (ST-I, P, CO): Sep 2013: pdf (0.7M)
  • D6.6 Final report on use-case benchmarking and QoE – M30 (SE, R, PU): Mar 2014: pdf (1.7M)
  • D6.7 Use cases implemented on VENTURI integrated platform v3 – M36 (ST-I, P, PU): Sep 2014: pdf (1.4M)
  • MS14 Definition of platform profiling tools and metrics and VENTURI platform V1 – WP6, M12 (ST-I): Sep 2012: pdf (202K)
  • MS15 First feedback iteration and improved VENTURI platform V2 – WP6, M24 (ST-I): Sep 2013: pdf (919K)
  • MS16 Final Integrated release V3 – WP6, M36 (ST-I): Sep 2014: pdf (100K)

WP7

  • D7.1 Website – M6 (FBK, O, PU): Mar 2012
  • D7.2.1 Dissemination and exploitation strategy M6 – M6 (Fraunhofer, R, PU): Mar 2012: pdf (1.8M)
  • D7.2.2 Dissemination and exploitation strategy M12 – M12 (Fraunhofer, R, PU): Sep 2012: pdf (2.1M)
  • D7.2.3 Dissemination and exploitation strategy M24 – M24 (Fraunhofer, R, PU): Sep 2013: pdf (3.3M)
  • D7.2.4 Dissemination and exploitation strategy M36 – M36 (Fraunhofer, R, PU): Sep 2014: pdf (3.1M)
  • D7.3 Business plan – M36 (metaio, R, PU): Sep 2014: pdf (1.8M)
  • D7.4.1 Contribution to standards Y1 – M12 (Fraunhofer, R, PU): Sep 2012: pdf (1.1M)
  • D7.4.2 Contribution to standards Y2 – M24 (Fraunhofer, R, PU): Sep 2013: pdf (1.1M)
  • D7.4.3 Contribution to standards Y3 – M36 (Fraunhofer, R, PU): Sep 2014: pdf (1.5M)
  • MS17 Website available – WP7, M6 (metaio): Mar 2012: pdf (197K)
  • MS18 Dissemination and exploitation strategy defined – WP7, M6 (metaio): Mar 2012: pdf (199K)
  • MS19 Dissemination and exploitation report finalized – WP7, M36 (metaio): Sep 2014 pdf (198K)

Deleted after Amendment 2

  • D2.2.3 Detailed Design Specifications for next STE platform – M27 (STE, R, PP): Dec 2013 ***** DELETED IN AMENDMENT 2 *****
  • D2.4.4 Next Generation STE Platform baseline delivery, implementing D2.2.3 specifications – M32 (ST-I, P, PP): May 2014 ***** DELETED IN AMENDMENT 2 *****
  • D2.5 Recommendation for HW, SW and system improvements for Next Generation Platforms – M32 (STE, R, CO): May 2014 ***** DELETED IN AMENDMENT 2 *****
  • MS6 Delivery of STE next generation platform baseline – WP2, M32 (STE): May 2014 ***** DELETED IN AMENDMENT 2 *****
Abbreviations:
  • Nature: nature of the deliverable R = Report, P = Prototype, D = Demonstrator, O = Other.
  • Dissemination level: PU = Public, CO = COnfidential (only for members of the consortium), PE = Restricted to a group specified by the consortium, and PP = Restricted to other programme participants.
Comments are closed.